Illustrative industrial plant at dusk with blue digital-twin overlays and an engineer using an immersive display.
Luke Johnson, wearing a blue jacket.

Luke Johnson / Personal portfolio

Chemical Engineer &
Software Development
Leader.

  • Oil and Gas
  • Process Industry

Industrial Simulation · Digital Twins · 3D / XR · Engineering Leadership

A professional portfolio spanning 16 years of industrial software, simulation and immersive technology development for oil and gas and the process industry – from hands-on engineering to product ownership and technical leadership.

ENGINEERING × SOFTWARE × EXPERIENCECareer & projects

01 / Perspective

Understanding the process. Shaping the experience.

My work sits at the intersection of engineering, software and people. I started by building dynamic process simulations for the oil and gas sector and progressed into leading teams, owning products and delivering industrial training systems.

This is a selection of that work: the engineering behind it, the experiences it enables and my part in bringing it together.

01

Industrial software & simulation

Chemical Engineering foundations, first-principles modelling and an understanding of real plant behaviour.

02

3D / XR & digital products

Connecting dynamic simulation with immersive environments, control systems and learning experiences.

03

Technical & product leadership

Bringing customers, engineers and multidisciplinary teams together around practical solutions.

02 / Career & projects

Engineering roots.
A broader perspective.

My projects, products and the roles behind them, from hands-on simulation to product and engineering leadership.

Explore all projects ↗
  1. 20262026

    Next chapter

    Available for work

    As of 4 Oct 2026

    Open to opportunities in engineering software, simulation, product development and technical leadership.

  2. 4 Oct 2026

    Building My Engineering Portfolio

    The homepage of my personal engineering portfolio, introducing my chemical engineering and software development background.

    Designed and built an AI-assisted, self-hosted portfolio that expands my CV into a visual career timeline, project case studies and a growing showcase of engineering and software development capabilities.

  3. As of 4 Oct 2026

    Working towards PMP

    Working towards Project Management Professional (PMP) certification, building on my experience of project planning and delivery.

  4. As of 4 Oct 2026

    Working towards IChemE chartership

    An IChemE Associate Member working towards chartership, drawing on my chemical engineering and simulation experience.

  5. 2026

    Career transition

    Development Manager

    Technical Simulation Consultants Ltd

    Apr 2026 — 4 Oct 2026

    Led the wider engineering software function across simulation, 3D/XR, cloud and web platforms.

  6. 2025

    Mar 2025 — Nov 2025

    Easington As-Built Update

    Site context: Aerial photograph of gas-processing equipment, buildings and pipework at the coastal Easington terminal complex.

    Helped bring the simulator into line with the actual plant through extensive operating-procedure, shutdown and control-system testing, followed by joint delivery and acceptance.

  7. Dec 2021 — May 2025

    Halliburton FloConnect

    Halliburton FloConnect product visualisation connecting automated well-test equipment around a central control platform.

    Managed the FloConnect simulation programme, coordinating costings and delivery while providing process-engineering oversight and defining the control-system integration approach.

  8. 2023

    Mar 2023 — Oct 2026

    XR Multiplatform and Build Support

    Wind-turbine environment from TSC’s operations and maintenance experience.

    Set the goal of customer-appropriate multiplatform deployment and worked with another developer on Jenkins CI/CD improvements.

  9. Mar 2023 — Oct 2026

    XR / VR Training

    Wind-turbine environment from TSC’s operations and maintenance experience.

    Owned the product requirements and technical direction for four industrial XR experiences covering hazard recognition, wind-turbine maintenance, equipment exploration and process isolation.

  10. 2022

    Approx. Jun 2021 — Jul 2022

    Highview Power BLU CRYOBattery

    Aerial concept rendering of Highview Power’s CRYOBattery facility, showing tall storage vessels, process buildings and interconnected pipework.

    Led 3D development and worked hands-on in Unity to connect Highview Power’s proposed Carrington plant with dynamic simulation and industrial controls.

    • Jul 2022 · Highview demonstration deliveredThe integrated demonstration was delivered in late July 2022.
  11. 2021

    May 2021 — Dec 2021

    Halliburton Surface Well Testing

    Halliburton early-production-facility visualisation with well-test equipment, pipework and a flare in an onshore layout.

    Led delivery of a reservoir-to-flare process simulator and shared 3D environment for remote onshore and offshore well-test training.

    • Nov 2021–Dec 2021 · Offshore simulator delivered
    • Oct 2021–Nov 2021 · Onshore simulator completed
  12. Mar 2020 — Approx. Jul 2021

    Liberty Steel Stocksbridge

    The Stocksbridge 40-inch rolling mill processing a glowing steel workpiece.

    Led the plant-scanning team and digital-twin delivery, and built a mathematical rolling-mill proof of concept within the InTiFi industrial digitalisation programme.

    • Approx. Jul 2021 · Project ended prematurelyThe Stocksbridge project ended early following funding disruption.
    • Aug 2020 · Stocksbridge laser scanningScanning took place at the end of August 2020.
  13. 2020

    Approx. Mar 2020 — Approx. Nov 2020

    Tolmount Extension and Rough Injection Project

    System context: Public diagram linking the offshore Tolmount platform and reservoir to Centrica’s Easington terminal by pipeline.

    Led the commercial and acceptance work for major Easington simulator changes, implementing hot-flash and distillation modifications for Tolmount and restored Rough injection.

  14. 2019

    From Jun 2019

    ABB at Offshore Europe 2019

    Visitors at the ABB Virtual Plant stand at SPE Offshore Europe 2019, with a triple-screen plant display and a participant lifting a VR headset.

    Led an immersive ABB exhibition project connecting a multiplayer virtual plant, System 800xA and HTC Vive VR, with a live fault-finding competition at Offshore Europe 2019.

  15. 2018

    Sept 2018

    BP Oman — Portable System Training Trial

    TSC composite showing participants in a training room, rugged transport cases and the portable system assembled with laptops and a triple-screen display.

    Took TSC’s newly built portable training system to Oman in September 2018 for a successful trial at the TPO Petrofac training centre, spending three weeks training new BP oil and gas recruits as one of two TSC trainers.

  16. From Sept 2018

    In-house Unity IVP Development

    Three Phase Separator vessel and access platforms in TSC’s interactive plant environment.

    Helped lead the replacement of our EON-based products with Unity versions after the agreement ended and we could no longer maintain the original products.

  17. From Jul 2018

    Establishment and Leadership of TSC’s 3D Studio

    Three Phase Separator vessel and access platforms in TSC’s interactive plant environment.

    Led our move to in-house 3D development, taking responsibility for the workflow, product direction, requirements and roadmap.

  18. 2018

    Career transition

    3D Development Manager

    Technical Simulation Consultants Ltd

    Jul 2018 — Apr 2026

    Led the 3D Studio, product direction and multidisciplinary delivery across Virtual Plant, XR and customer projects.

  19. Mar 2018 — Jul 2018

    Portable Training System — Design & Build

    Portable training system video thumbnail showing a training session, protective flight cases and the assembled laptop and triple-screen classroom setup.

    Turned BP’s portability challenge into a self-contained training system with a folding triple-screen display, networked operator and instructor stations, and custom flight cases; designed and built with Harry Wright at TSC.

  20. 2017

    Jul 2016 — Aug 2017

    Easington Full-Site Operator Training Simulator

    Site context: Aerial photograph of gas-processing equipment, buildings and pipework at the coastal Easington terminal complex.

    Led delivery of the full-site operator training simulator, combining hands-on process engineering with DeltaV emulation, customer engagement and project ownership.

    • Aug 2017–Sept 2017 · Easington full-site OTS delivered
  21. 2016

    By end of 2016

    Centrifugal Compressor

    EON-based centrifugal compressor: EON centrifugal compressor package inside a virtual industrial building, with skid-mounted machinery, pipework, instruments and a local control enclosure.

    Product ownership across the process and control behaviour of a gas-compression training package, linking the compressor, anti-surge controls and supporting utilities.

    • By end of 2016 · First modern EON-based IVP availableThe Centrifugal Compressor was the first modern EON-based IVP, available by the end of 2016, before the later Unity replacement.
  22. Oct 2013 — Oct 2026

    TPS200 Three-Phase Separator

    TPS200 three-phase separator at Forth Valley College, with two storage vessels, a transparent horizontal separator, instrumentation and its connected PC.

    Took an early process-training design through to operational machines, global delivery and in-place upgrades, connecting PLC automation, SCADA and hands-on engineering.

    • Approx. Apr 2016 · Pump and recycle-control upgrades
  23. 2015

    2015 — 4 Oct 2026

    Sales & Marketing Team

    Visitors at the ABB Virtual Plant stand at SPE Offshore Europe 2019, with a triple-screen plant display and a participant lifting a VR headset.

    Combined technical sales, proposals, account management, marketing and CRM ownership with customer installation, support and training.

  24. From Sept 2015

    EON Reality IVP Creation

    Two participants in hard hats and high-visibility jackets interacting with the TSC virtual plant training system in an EON Icube.

    Owned the engineering and product definition of TSC’s EON-based Virtual Plants: built the process simulator, devised all synchronisation logic and specified the process, learning objectives and 3D behaviour for EON’s technical artists.

  25. Jul 2015 — Sept 2015

    South Tyneside College — IPC Training Lines

    IPC process-control, bottling and handling equipment along the laboratory benches at South Tyneside College, with PC workstations and a mounted Omron HMI.

    Delivered two complete IPC training lines with custom Omron HMIs and TSC SCADA, taking responsibility for costing, configuration, logistics, installation, training and long-term support.

  26. Jul 2015

    Savannah IPC Installation

    Complete SMC IPC-200 training line with process-control, bottling and palletising stations.

    Installed a standalone process-training unit at Savannah Technical College in Georgia, USA.

  27. 2014

    By end of 2014

    Redcar and Cleveland IPC Restoration

    Complete SMC IPC-200 training line with process-control, bottling and palletising stations.

    Restored the Siemens training line, including its I/O, PLC code and OPC connectivity. It was working by 2014.

  28. 2014

    Career transition

    Senior Simulation Engineer

    Technical Simulation Consultants Ltd

    Jul 2014 — Jul 2018

    Led simulator and hardware training delivery, combining hands-on engineering with project and account ownership.

  29. 2013

    Aug 2012 — Nov 2013

    Methanol Recovery Simulator and Associated Updates

    Illustrative interface: Illustrative DeltaV Operate display showing a distillation column, vessels, control values and trend panels.

    Implemented and delivered a methanol–water distillation simulator, from C emulation and thermodynamic code through to procedure-based testing and shift-team delivery.

  30. 2012

    2012 — Oct 2026

    Forth Valley College Hardware Support

    Complete SMC IPC-200 training line with process-control, bottling and palletising stations.

    Maintained Forth Valley College’s three IPC units from 2012 and supported its process-training equipment, including TPS200.

  31. 5 Jul 2012

    Pipe Friction and Pressure-Drop Modelling

    Generic diagram of upstream and downstream gas-pressure nodes linked by a pipe-friction flow item configured with length, diameter and roughness.

    Owned development and simulator testing of a C-based SimEdit pipe-friction item, revisiting modelling assumptions to represent pressure loss and gas flow more accurately.

    • 8 Jun 2012 · Flow item ready for simulator testingDeveloped to revisit simplified pressure-loss assumptions, then tested in the simulator against operating data.
  32. Approx. Jun 2012

    Wormington — Compressor Operability Study

    Aerial reference photograph of Wormington compressor station.

    Modified an existing simulation model and carried out additional compressor start-up studies for AMEC, assessing transient behaviour, temperature response and operating constraints.

  33. 2011

    Approx. Nov 2010 — Approx. Jun 2011

    Hole House Phase 3 — Dynamic Simulation Study

    Aerial site photograph from Kistos’s Hill Top and Hole House page, showing gas-storage equipment surrounded by farmland.

    Carried out dynamic simulation studies and authored the report for AMEC Darlington, assessing start-up, shutdown, process safety times and compressor-surge behaviour.

  34. 20102010

    Career transition

    Simulation Engineer

    Technical Simulation Consultants Ltd

    Jul 2010 — Jul 2014

    Developed dynamic process models, hydraulic capability and operator training simulators.

  35. 2009

    15 Sept 2008 — Approx. Sept 2009

    TSC7 Generic Simulation Redevelopment

    TSC7 three-phase separator training simulator showing oil, water and gas outlets, level indication and process controllers.

    Rebuilt generic training simulators from the ground up using standardised, reusable process-equipment models, retaining their learning objectives—the start of my product creation and management journey.

    • 20 Apr 2009–15 May 2009 · Updated models shipped for customer feedbackPID level control, flash-vessel control, direct/cascade control and pump-operation models were supplied for operator-training feedback.
  36. 20082008

    Career transition

    DIS Placement Student

    Technical Simulation Consultants Ltd

    15 Sept 2008 — Approx. Oct 2009

    Rebuilt generic training simulators using reusable equipment-modelling approaches, shared standards and testing—the start of my product creation and management journey.

  37. 20062006

    University degree

    BEng Chemical Engineering with DIS

    Loughborough University

    Sept 2006 — Jul 2010

    Chemical Engineering studies covering thermodynamics, fluid dynamics, process control, research and plant design, with an industrial placement at TSC.

    Year 1
    Approx. Sept 2006 — Jul 2007
    Year 2
    Approx. Sept 2007 — Jul 2008
    DIS placement year
    15 Sept 2008 — Oct 2009
    Year 3
    Approx. Oct 2009 — Jul 2010
  38. 20042004

    A levels

    A levels

    South Cheshire College

    Approx. Sept 2004 — Approx. Jul 2006

    Maths, Further Maths, Chemistry and Physics.

  39. 19991999

    Secondary education

    GCSEs

    Clough Hall Technology School

    1999 — 2004

    Maths, English, Science (Double Award), Metalwork, Electronics, Graphics, History and Geography, plus GCSE Astronomy in Year 10.

Next conversation

Let’s talk engineering,
software and what’s next.

Connect with me on LinkedIn ↗