Client project / Centrica Energy Storage
Tolmount Extension and Rough Injection Project.
Led the commercial and acceptance work for major Easington simulator changes, implementing hot-flash and distillation modifications for Tolmount and restored Rough injection.
Timeline image: System context · ITI Group, public reference diagram ↗
Multiple major plant changes
The project ran approximately March–November 2020 and encompassed substantial Easington modifications, the Tolmount extension and Rough injection functionality. It was broader than a single additional simulator section.
I worked on the hot-flash system and new heater, interpreting an incomplete third-party P&ID and defining workable control loops against the stated specification. I also implemented distillation modifications and carried out significant whole-plant testing against operating procedures.
An accepted representation of intended operation
The physical plant configuration and controls were still developing. We made engineering decisions to produce a usable training representation, including DCS screens, before commissioning. The customer subsequently used some of our simulator screens for its actual control system.
Acceptance established an agreed representation of intended operation, not an as-built replica of the plant ultimately installed. Later maintenance and the As-Built project aligned the simulator with that installation.
Testing and acceptance
I led acceptance and the commercial work. I tested the PlantPAx emulation and the separately implemented Tolmount normally unmanned installation simulator, controlled from shore. I did not implement those systems.
Control-system and process scope
Tolmount used a different DCS: Rockwell PlantPAx. An entirely new control-system emulation was created for that part of the simulator, alongside the DeltaV environment already represented for Easington.
The extension brought another process scope and another control-system interface into the same training programme. It illustrates the importance of understanding both the engineering behaviour and the control environment when developing a useful operator simulator.
Customer projects
Related customer projects
Client projectSite context · Equinor, reference photograph supplied by LukeOil and gas / Operator training
Easington As-Built Update
Helped bring the simulator into line with the actual plant through extensive operating-procedure, shutdown and control-system testing, followed by joint delivery and acceptance.
Client projectSite context · Equinor, reference photograph supplied by LukeOil and gas / Operator training
Easington Full-Site Operator Training Simulator
Led delivery of the full-site operator training simulator, combining hands-on process engineering with DeltaV emulation, customer engagement and project ownership.
Client projectIllustrative interface · DeltaV reference image supplied by LukeOil and gas / Operator training
Methanol Recovery Simulator and Associated Updates
Implemented and delivered a methanol–water distillation simulator, from C emulation and thermodynamic code through to procedure-based testing and shift-team delivery.